Small Excavators Of China Coal Group Are Delivered To Sichuan And Dezhou, Shandong Respectively
2022/10/14
On October 12, China Coal Group entered the intensive delivery period again. The production, quality inspection, warehouse, logistics and other departments worked together and worked overtime to assemble and load the vehicles according to the time nodes and delivery order agreed in the contract, and deliver the full load of mechanical equipment to various places. A batch of small excavators in the second workshop of intelligent equipment production and manufacturing are being loaded