End ring has the box structure,and whole rotor has the high strength structure. The single ended driver is allowed. Using the pinion and big drive, smooth motion without impact. The match between hydraulic clamping, hydraulic side pad and wagon accords with requirements of railway rules. The clamping device is mounted on the side beam, and clamping cylinder is pressed in operation. The independent locking has high reliability.
1. State-of-the-art technology & facilities;
2. More than 30 years experience in design & production of bulk material handling system;
3. More 30% stall are engineers and technical background;
4. In accordance with varies standards like AS, BS, FEM, JIS, DIN etc;
5. Max. 4-wagon tippling system.
Welding workshop |
Material preparation workshop |
Machining workshop |
Assembly workshop |
|
Dimension |
205m×36m×2 |
156m×26m |
217m×36m×2 |
217m×36m |
Overhead crane |
2×150T/16m |
75T/16m |
2×150T/16m |
2×150T/16m |
Main gate |
16m×12m |
12m×10m |
16m×12m |
16m×12m |